UNITECH | HVAC Specialists Dubai
Dubai’s Licensed HVAC Specialists | Trade License No: 134585 ISO Compliant Safety Protocols
District Cooling Plant
DCS Technician team arriving in 57 minutes
Rated 4.9/5 based on 322+ Google Reviews

District Cooling ExpertsFCU, AHU & ETS Engineering

Specialized maintenance for Chilled Water Systems. We service Actuators, Valves, and Heat Exchangers in Dubai's high-rise towers.

  • 1. Fan Coil Unit (FCU) Maintenance
  • 2. Air Handling Unit (AHU) Services
  • 3. Fresh Air Handling Unit (FAHU)
  • 4. ETS Room Heat Exchanger Flushing
  • 5. Chilled Water Valve & Actuators
Technical Portfolio

Past Work & Diagnostics

Recent successful projects involving Actuator replacement, HEX flushing, and Hydraulic balancing across Dubai.

Fan Coil Unit (FCU) Retrofit

Jumeirah Village Circle
Technical Diagnosis
Before
Resolved State
After

Diagnosis & Solution

Diagnosed 'No Cooling' issue. Found the 2-way actuator valve was seized in the closed position. Replaced with a new Honeywell actuator and cleaned the Y-strainer.

Status Report
Optimized

ETS Heat Exchanger Flushing

Jumeirah Islands
Technical Diagnosis
Before
Resolved State
After

Diagnosis & Solution

Building faced low heat transfer efficiency. Performed Clean-in-Place (CIP) chemical flushing on the Plate Heat Exchanger (HEX) to remove calcium fouling.

Status Report
Optimized

FAHU Actuator & Damper

Palm Jumeirah
Technical Diagnosis
Before
Resolved State
After

Diagnosis & Solution

Fresh Air unit was supplying humid air. Calibrated the modulating damper actuator and replaced the enthalpy wheel belt to restore energy recovery.

Status Report
Optimized

Chilled Water Leak Repair

Business Bay
Technical Diagnosis
Before
Resolved State
After

Diagnosis & Solution

Rectified severe condensation and dripping from main riser pipes. Removed soaked insulation, treated pipe corrosion, and applied new Armaflex cladding.

Status Report
Optimized

Air Lock & Hydraulic Balancing

Arabian Ranches
Technical Diagnosis
Before
Resolved State
After

Diagnosis & Solution

Top floor was not cooling. Identified air lock in the hydraulic network. Purged air via automatic air vents (AAV) and balanced system pressure.

Status Report
Optimized
Live Fleet Status: Online

Live Telemetry & Logistics

Real-time coordination of our 17 HVAC specialist teams across Dubai.

Active
10+
On-Site
Standby
07
Available
Sector: Dubai South & North
Jumeirah Golf EstEmirates HillsPalm JumeirahDIFCBusiness Bay+3 more
Dispatch LogLive
Arabian Ranches
Compressor Trip
In Progress
Jumeirah Park
Cooling Tower
Finishing
Dubai Marina
Gas Refill
Dispatched
Palm Jumeirah
Pump Seal
In Progress
Meadows
PPM Visit
Scheduled
Check Availability in Your Area
Technical Engineering

District Cooling Engineering & Hydraulics

We provide advanced engineering solutions for Chilled Water Systems. Our technicians are trained on FCU, AHU, and ETS Room hydraulics to ensure maximum Delta-T efficiency.

1Fan Coil Unit (FCU)

The primary cooling unit for bedrooms, living rooms, and offices.

1. Fan Coil Unit (FCU)

Technical Information

Connected to the district cooling network. It contains no compressor, only a chilled water coil and a blower fan.

Working Principle

Chilled water flows through the coil; the fan blows air over it to cool the room. Temperature is regulated by an actuator valve stopping water flow.

Service Protocols & Engineering Solutions

Cleaning & Hygiene
  • Strainer basket removal & cleaning
  • Deep coil disinfection & degreasing
  • Drain pan sludge removal
Hydraulic Repair
  • 2-Way/3-Way Actuator Valve replacement
  • Thermostat communication logic
  • Blower motor bearing replacement

2Air Handling Unit (AHU)

High-static pressure units for malls, lobbies, and large halls.

2. Air Handling Unit (AHU)

Technical Information

Located in dedicated mechanical rooms. These handle large volumes of air and require heavy-duty belt-driven motors.

Working Principle

Receives high-flow chilled water from the main risers. Uses large V-bank filters to purify air before cooling it across a massive coil surface.

Service Protocols & Engineering Solutions

Heavy Maintenance
  • V-Belt tensioning & laser alignment
  • Pillow block bearing lubrication
  • Vibration analysis
Technical Services
  • Large-scale chemical coil washing
  • Differential pressure sensor calibration
  • Variable Frequency Drive (VFD) tuning

3Fresh Air Handling Unit (FAHU)

Treats outdoor air to pressurize the building and provide ventilation.

3. Fresh Air Handling Unit (FAHU)

Technical Information

Critical for Indoor Air Quality (IAQ). It cools hot outdoor air before injecting it into the building's corridors.

Working Principle

Uses a 'Heat Wheel' to recover energy from exhaust air. Regulates humidity and temperature using modulating damper actuators.

Service Protocols & Engineering Solutions

Energy Recovery
  • Heat Wheel cleaning & belt replacement
  • Fresh air damper adjustment
  • Sand trap louvre cleaning
Filter Management
  • Bag filter replacement (F7/F9)
  • Panel filter washing
  • Differential pressure monitoring

4Energy Transfer Station (ETS)

The heart of the building's cooling infrastructure.

4. Energy Transfer Station (ETS)

Technical Information

The interface between the District Cooling Provider (e.g., Empower/Tabreed) and the building's internal water loop.

Working Principle

Uses massive Plate Heat Exchangers (HEX) to transfer cold energy from the provider's water to the building's water without mixing them.

Service Protocols & Engineering Solutions

Heat Exchanger Services
  • Clean-in-Place (CIP) chemical flushing
  • Back-flushing to remove debris
  • Gasket leak checks
System Efficiency
  • Delta-T performance analysis
  • Primary/Secondary pump staging
  • Bypass valve calibration

5Control Valves & Hydraulics

The 'Brain' of the chilled water flow management system.

5. Control Valves & Hydraulics

Technical Information

Hydraulic balance is essential. Stuck valves cause 'Low Delta-T Syndrome', leading to penalties from cooling providers.

Working Principle

Pressure Independent Control Valves (PICV) and Motorized Actuators regulate water flow to match the exact cooling load required.

Service Protocols & Engineering Solutions

Valve Engineering
  • PICV cartridge replacement
  • Actuator motor torque testing
  • Gate valve gland packing
Flow Dynamics
  • Air purging from chilled water risers
  • System pressure balancing
  • Automatic Air Vent (AAV) replacement
Prevention Strategy

Hydraulic Efficiency & Hygiene

Clogged strainers and scale buildup reduce chilled water flow, leading to warm rooms and high bills. Our 60% focus is on Hydraulic Maintenance and cleaning protocols.

Hydro-Jet Strainer & Coil Cleaning

Sludge in your pipes blocks water flow. We remove the Y-strainer mesh, hydro-jet the coil, and restore full hydraulic circulation.

Y-Strainer mesh cleaning
Bio-degradable foam coil wash
Drain line high-pressure flush
Flow restoration

Duct & ETS Room Sanitization

Damp FCU environments breed mold. We sanitize ducts and deep-clean mechanical ETS rooms to ensure hospital-grade air quality.

Anti-fungal fogging
ETS room degreasing
Mold remediation
Odor elimination

Preventive Valve & Actuator Check

Avoid 'Low Delta-T' penalties. We inspect every actuator valve to ensure it closes tightly when cooling is not required.

Actuator torque check
Valve closure verification
Thermostat calibration
Leak inspection

Transparent Pricing

Honest Pricing. No Hidden Fees. VAT Included.

Basic FCU Service

AED 150 - 250
  • Filter & Strainer cleaning
  • Thermostat check
  • Drain flow test
  • Technician Transport
Recommended

Deep Hydraulic Flush

AED 350 - 550
  • Coil chemical foam wash
  • Strainer hydro-jetting
  • Actuator inspection
  • Before/After Report

Valve Replacement

AED 450 - 800+
  • Actuator Motor Supply
  • Valve Body installation
  • Wiring & Logic Setup
  • Flow Testing
Successful Operations

Project Showcase

Real diagnostic results from residential and commercial towers across Dubai.

Before
PRE-DIAGNOSIS
After
OPTIMIZED

Villa in Jumeirah Islands - Air Lock Issue

Jumeirah Islands

Operational Failure Upper floor FCUs blowing warm air despite thermostat set to 20°C.

Technical Solution Identified massive air lock in the riser. Performed air bleeding and pressure balancing.

Final Performance Metric

Chilled water circulation restored. Exit temperature dropped to 21°C.

Before
PRE-DIAGNOSIS
After
OPTIMIZED

Office in Business Bay - Low Delta-T

Business Bay

Operational Failure High cooling bills from Empower due to Low Delta-T syndrome.

Technical Solution Found 12 stuck-open actuator valves bypassing the coil. Replaced with new Belimo actuators.

Final Performance Metric

Delta-T efficiency restored. Monthly penalty fees eliminated.

Transparency Protocol

The Digital Health Report

We don't just say we fixed it; we prove it. Every service visit concludes with a comprehensive technical PDF report sent directly to your device.

Before & After Photos

Visual proof of cleaning and technical repairs.

Instant Digital Delivery

Receive your asset's full history via WhatsApp & Email.

Service Report #4921

October 2024

Diagnosis Notes:

Strainer hydro-jet cleaned. Actuator torque verified. Chilled water flow restored to 12.5 GPM.

PhotosService Evidence Attached

Tailored DCS Care for Every Space

From residential towers to massive commercial districts, we have the specialized tooling for every chilled water environment.

Apartments

Apartments & Offices

Specialized Fan Coil Unit (FCU) maintenance. We resolve seized actuators and clogged strainers to eliminate air locks and restored temperature stability.

Mall

Malls & Lobbies

Heavy-duty Air Handling Unit (AHU) services. Precision belt alignment, pillow block bearing lubrication, and high-static pressure coil washing.

Building

Building Infrastructure

Full-scale Energy Transfer Station (ETS) maintenance. Advanced Plate Heat Exchanger (HEX) flushing to recover critical heat transfer efficiency.

Google Maps

UNITECH DCS Specialists

4.9
322 Google reviews

District Cooling Engineers in Dubai • Open 24 Hours

F

Facility Manager

Local Guide • 2 days ago

Fan Coil Unit (FCU)

UNITECH understands the ETS room complexities. Their CIP flushing of our Plate Heat Exchangers improved our heat transfer efficiency by 40%.

M

Mr. James

Local Guide • 3 days ago

ETS Heat Exchanger

I had water dripping from my FCU access panel. They found the drain pan was blocked with sludge. Hydro-jetted it and re-insulated the pipes.

S

Sarah Al-Maktoum

Local Guide • 1 week ago

Chilled Water FCU

The digital report showing the 'Before' and 'After' of the strainer cleaning was impressive. The AC is finally silent and cold.

Frequently Asked Questions

Do you serve commercial buildings?

Yes, we specialize in Rooftop Package Units for malls, offices, and warehouses.

Is your work guaranteed?

Yes, we provide a 1-month warranty on service and up to 1-year warranty on replaced compressors.

How quickly can you arrive?

For emergencies in Dubai, our target arrival time is under 90 minutes.

Why is chemical cleaning necessary?

Water alone cannot remove the salt and dust cemented onto the aluminum fins. Chemical foam lifts this grime to restore heat exchange efficiency.

Live Update: Out of 17 HVAC Specialist teams:

10+ working on-site (Busy).

07 waiting for your call!